Making Your Vision Reality

The BAC team is busy this Fall — check out one of our current projects as it unfolds. This gives you a taste for the dramatic changes we love to make when people approach us with an idea.

The BAC team first demolished the existing deck to make space for a two story addition to the rear of the King home. The foundation for the bedroom and living room addition is prepared, and a concrete patio slab created for the walkout basement. More massive changes await to the interior ceilings — as we demo half of a cathedral ceiling — and rework the front & rear elevations. The results will be stunning on the inside and out.

Let us know if we can help you take your project from the “if only” stage to REALITY!